Welcome, Guest. Please
Login
.
Nov 15
th
, 2024, 4:42am
News:
Want to join the rbent Forum? See
this thread
.
rbent Forum
›
General Category
›
Upcoming Rides
(Moderators:
FlyingLaZBoy
,
aikigreg
,
Bud_Bent
)
‹
Previous topic
|
Next topic
›
Pages: 1
Clown ride Time change (Read 632 times)
jcsadowski
Five Star Member
Clown #1
Posts: 1199
Clown ride Time change
May 31
st
, 2010, 2:03pm
Starting Thursday may 27, 2010 the clown will meet at 8:00 for the summer.
Back to top
2009 Carbon fiber CA 2.0
2014 Schlitter Encore
IP Logged
jcsadowski
Five Star Member
Clown #1
Posts: 1199
Oooops
Reply #1 -
May 31
st
, 2010, 3:55pm
time change is on June 3.
Back to top
2009 Carbon fiber CA 2.0
2014 Schlitter Encore
IP Logged
power_bent
Five Star Member
rbent member
Posts: 632
Re: Clown ride Time change
Reply #2 -
May 31
st
, 2010, 10:42pm
Hey John what about 7:30
Back to top
Keep Pedaling,the power coming
Midracer being built
Homebuilt Bike X orange
Homebuilt Squared High Racer (20")
Catrike Expedition ( Red)
Wife: Sun Tadpole Trike
IP Logged
Pages: 1
rbent Forum
›
General Category
›
Upcoming Rides
(Moderators:
FlyingLaZBoy
,
aikigreg
,
Bud_Bent
)
‹
Previous topic
|
Next topic
›
Forum Jump:
-----------------------------
General Category
-----------------------------
- rbent Lobby
=> Upcoming Rides
- Ride Reports
- Technical
- Photos
- Marketplace
- Test Zone
rbent Forum
» Powered by
YaBB 2.1
!
YaBB
© 2000-2005. All Rights Reserved.